电子期刊

ITASCA 中国
顶级水平团队,专门解决超常规复杂工程...
了解更多

ITASCA 专家团队
C. Fairhurst博士, It...
了解更多

电子期刊列表

当前位置:首页 - 电子期刊 - 电子期刊列表
ITASCA电子期刊

    ITASCA电子期刊由ITASCA集团公司创办,主要讲述ITASCA集团公司各期关于咨询、软件、研讨会、培训和出版物等方面的资讯。 欢迎各位新老用户点击以下链接阅读.

 Groundworks 2010年03月刊 —隧洞大变形模拟及ITASCA软件开发动态
[ Abstract ]Modeling of Large Deformations in Tunnels Recent tunnel modeling work performed by Itasca Consultores S.L. (Oviedo, Spain) has dealt with the case where, when l... + VIEW DETAILS
 Groundworks 2010年01月刊 —围岩破裂损伤颗粒流方法研究
[ Abstract ]Itasca Consulting China, Ltd. has been involved in an engineering and research effort for deep tunneling for the Jinping II hydropower project in Sichuan Provin... + VIEW DETAILS
 Groundworks 2009年08月刊—若干颗粒流分析案例
[ Abstract ]More than ten years ago, interest in PFC led a farm implement manufacturing company to contact Itasca about application of the code to simulate grain harvesting... + VIEW DETAILS
 Groundworks 2009年05月刊—ITASCA旗下微震工程公司ASC简介
[ Abstract ]For more than a decade, Itasca International Inc. (Itasca) and Applied Seismology Consultants (ASC) have developed a growing partnership that extends to project... + VIEW DETAILS
 Groundworks 2009年03月刊 —高水压矿脉排水减压系统设计
[ Abstract ]DEPRESSURISING AN UNDERGROUND ORE BODY AT THE MCARTHUR RIVER MINE IN NORTHERN SASKATCHEWAN, CANADA Pre-mining depressurising of a deep ore body at the McArthu... + VIEW DETAILS
 Groundworks 2008年12月刊 —储藏隧洞支护效果评价
[ Abstract ]Itasca Consultants s.a.s (Ecully, France)–BEHAVIOR OF REPOSITORY TUNNELS SUPPORT Numerical modeling was used to compare the support stability for tunnels in ... + VIEW DETAILS
 Groundworks 2008年05月刊 — 冲击地压
[ Abstract ]Itasca Consulting Canada, Inc. –Beyond Numerical Modeling 'I've heard of Itasca. You are a numerical modeling company.' That is what most Itasca engineers — h... + VIEW DETAILS
 Groundworks 2008年02月刊 — 大型露天矿坑边坡设计方案
[ Abstract ]Development of New Analysis Tools for Open Pit Design (Itasca S.A.) The design of open pits normally involves several scales of analysis (bench, interramp, ov... + VIEW DETAILS
 Groundworks 2007年12月刊 — GBT双管隧洞咨询研究概况
[ Abstract ]The Gotthard Base Tunnel (GBT) in Switzerland, a double tube single track railway tunnel with a length of 57 km, is currently under construction. In addition to... + VIEW DETAILS
 Groundworks 2007年08月刊 — SKB咨询研究进展
[ Abstract ]In a project for SKB, Itasca Geomekanik AB conducted a detailed study of a minor fracture zone at the Äspö Hard Rock Laboratory. The goal was to increase knowle... + VIEW DETAILS
共27条记录 共3页  首页 上一页 下一页 末页    每页记录10条 跳转到第   
地址: 湖北省 武汉市 光谷大道特1号 国际企业中心二期5-301-1室
鄂ICP备05008445号
CODE: 430074 TEL: (027)8786-2349 FAX: (027) 6784-5165 技术支持:捷讯技术